Contact Sitemap Project-File Home  
 
 
Home > Installation > Duties of the floorlaying company
Cracks

Professional repairing of cracks

Cracks are caused by different things, and are very typical for cement screeds.

Existing cracks should be cut in to a depth of 2/3 of the screed thickness. The screed should be cut every 20 – 30 cm transversely to the same depth, so that the screed repair champs can be inserted.

The prepared cracks should be filled with a two-component resin and be strewn with quartz sand when fresh.

 

Cracks in the surface of the subfloor:

 

 

   
 
Top of the Page   Put this Page in your Project-File   Print this Page   Send this Page via eMail  

 

Copyright © nora systems GmbH 2007 - Imprint - Disclaimer